Lake Orr Drive Tenant Fit Out Project

Office Fitout

Varsity Lakes, Gold Coast, Queensland

September 2021

Project Description

Transforming Level 1 at 1 Lake Orr Drive into a Modern Workspace for Keypoint Accountants

Project Overview

At 1 Lake Orr Drive, Varsity Lakes, the Level 1 tenancy has been transformed into a contemporary office space for Keypoint Accountants. This fit out project focused on creating a functional and aesthetically pleasing environment tailored to the firm’s operational needs.​

Project Details

  • Location: 1 Lake Orr Drive, Varsity Lakes​, QLD
  • Client: Keypoint Accountants​
  • Scope: Level 1 fitout including partitions, glazing, cabinetry, flooring, electrical, fire services, and plumbing.​

Design and Features

The fitout introduced several key areas within the office:

  • Private Offices and Meeting Spaces: Installation of new partition walls to create two private offices, an interview room, a meeting room, and a waiting area, all designed with acoustic insulation to ensure privacy.​
  • Open-Plan Workspace: A central open-plan area fosters collaboration among team members.​
  • Kitchen and Amenities: The kitchen area features white cabinetry with soft-close mechanisms, light-colored stone-look laminate benchtops, and a white subway-tiled splashback.​
  • Custom Joinery: Timber slats above selected walls and bespoke cabinetry, including enclosures for the electrical switchboard, add functional elegance to the space.​
  • Flooring: Vinyl planks in the kitchen and waiting areas provide durability and a modern aesthetic.​
  • Glazing: Glass panels with aluminum frames and frosted strips at eye level enhance natural light while maintaining privacy.​

Challenges and Solutions

Working within an operational building required scheduling noisy and disruptive tasks outside of normal trading hours to minimise impact on other tenants. Additionally, coordinating multiple compliance elements, including fire services and plumbing certifications, was essential to meet regulatory standards.​

Outcome

The completed fitout delivers a professional and efficient workspace that reflects Keypoint Accountants’ brand and supports their business operations. The thoughtful design and quality finishes contribute to an environment that is both inviting and conducive to productivity.​

​This project exemplifies a commitment to delivering tailored office solutions that meet client needs while adhering to industry standards and best practices.​

Services Completed

Fitout & Construction (Office, Retail, Hospitality, Industrial) Full commercial office fitout including partition walls, glazing, kitchen installation, and flooring. Delivered to suit a modern accounting practice with both private and collaborative spaces.
Joinery & Custom Carpentry Custom joinery included timber cabinetry in the meeting room, a concealed switchboard enclosure, and hardwood timber slats as architectural features above low walls.
Interior Design & Space Planning Concept-to-completion layout planning to optimise workflow and space functionality. Selection of finishes, colours, and materials to align with the brand and enhance user experience.
Project Management & Consultation End-to-end coordination of trades, compliance certification (Forms 4, 16, 11), and sequencing of works to ensure minimal disruption in a live building environment.
Electrical & Plumbing Work Full electrical fit out including power, data, lighting circuits, and under-sink appliance connections. Plumbing included installation of kitchen sink, water heater, and Insinkerater hot/cold tap.
Furniture & Office Supplies Procurement and installation of ergonomic office furniture, storage units, and collaborative workstations to support daily operations and staff comfort.
Signage & Branding Elements Coordination of internal and external signage including reception logos, wayfinding elements, and wall graphics to reflect the client’s branding and enhance visual identity.
Technology Integration (AV, IT, Security) Installation of AV systems for meeting rooms, structured cabling for IT infrastructure, and coordination of security systems including access control and surveillance where required.
Fire Detection & Emergency Systems: Fire system isolation, reconfiguration, testing and certification in accordance with AS1670.1.

Project Highlights

Architectural Timber Slats
Feature hardwood timber slats were installed above selected low-height walls, offering a striking visual detail that elevates the space and adds a warm, natural texture to the professional setting.
Carbon Neutral Flooring
Vinyl planks selected for the kitchen and waiting area were not only fire-rated, acoustic-backed, and P3 slip-rated, but also certified carbon neutral — supporting sustainability without compromising on performance or aesthetic.
Concealed Services Joinery
Bespoke MDF cabinetry was installed to discreetly enclose the electrical switchboard within the waiting area, maintaining clean sightlines and ensuring compliance with safety regulations while complementing the interior palette.
Acoustic Partitioning for Privacy
All internal partitions were constructed with acoustic insulation and gyprock on both sides, ensuring sound control for offices, meeting spaces, and interview rooms — vital for confidentiality in a professional services environment.
Subtle Privacy Glazing
Frosted glazing strips were applied at 1050mm above finished floor level on new glazed panels, balancing natural light flow with subtle privacy between rooms.
Smart Space Planning
The layout delivered a balance of private offices, collaborative workspaces, and support areas (e.g., print, file, and kitchen zones), all integrated within a compact floor plate to maximise usable area.
Minimal Disruption Execution
Noisy and disruptive tasks were scheduled outside of trading hours, ensuring minimal impact on surrounding tenancies and allowing for efficient progress in a live environment.
Get In Touch

We want to work with you. Submit the form and we’ll be in touch.