Rooftop Steelwork Façade Feature Removal

SIndustry7 was engaged by AsheMorgan to remove a dilapidated steel feature structure bolted to the side of the building at 60 Albert Street, Brisbane City. The works were carried out together with our high ropes subcontractor, Total Asset Maintenance (TAM). Working as one team over a number of weekends, we removed the structure section by section in a safe and controlled manner. All removed steel was taken off site and recycled, diverting it from landfill.
Once the removal was complete, the team carried out all make-good works to the façade at the end of the project, including all penetrations and the steel plates cast into the concrete.

COORDINATION

Working alongside our high-ropes subcontractor, Total Asset Maintenance (TAM), our team coordinated the works across multiple weekends, carefully dismantling and removing the structure section by section in a safe and controlled manner.

SUSTAINABILITY

Industry7 is committed to diverting waste from landfill. We certify that the following materials were collected and recycled through an authorised local facility in accordance with environmental legislation, supporting our partners’ climate reporting requirements.

COMPLEX WORKS

Following removal, the team completed the associated make-good works to leave the building façade ready for its next chapter. Another example of delivering complex works through careful planning, collaboration and a commitment to doing things properly.